FAQ's
FAQ's
Frequently asked questions about the TOPseven platform:
Frequently asked questions about the TOPseven platform:
Data Ownership, Purpose Limitation and Exit Protection
Data Ownership, Purpose Limitation and Exit Protection
Who owns the raw data captured through the TOPseven platform?
How is strict purpose limitation of inspection data enforced contractually and technically, including the ability to opt out of AI training per operator?ustomize the animations?
How are data retention obligations of up to ten years met when the platform contract term is shorter?
What happens to data access, purpose limitation, and export rights in the event of an ownership change or platform provider exit?
What mechanisms prevent vendor lock-in, and how portable is inspection data if the customer changes platform?
Accreditation, Immutability and Audit Trail
Accreditation, Immutability and Audit Trail
How is raw data immutability and audit readiness ensured in a cloud-based inspection platform?
Can TOPseven outputs be used within an ISO 17020 accredited inspection process, including stamp, signature, and required text blocks?
How does TOPseven ensure that measurement results are comparable across years, turbines, and operators and form an audit-proof evidence chain?
LPS Measurement Validation and Update Governance
LPS Measurement Validation and Update Governance
How is LPS measurement validation documented, and what reference documents are available?
How is measurement validity ensured after software updates, and what documentation do auditors receive about the software version in use?
Can the TOPseven LPS measurement detect partial cable faults — specifically high-resistance junctions, partial melts, and corrosion — that pass a standard resistance continuity test?
What is this cHow does the TOPseven LPS measurement method relate to IEC 61400-24 requirements, and what is the path to formal recognition?omponent?
Insurance Acceptance
Insurance Acceptance
Which insurance companies accept TOPseven LPS measurement evidence, and what is the acceptance process for new jurisdictions?
Liability, Data Loss and Field Process
Liability, Data Loss and Field Process
Who bears the cost of data loss requiring a re-flight, and how is system fault distinguished from user error?
How is data completeness verified in the field before leaving the site?
Platform Integration and Data Portability
Platform Integration and Data Portability
In what formats can inspection results be exported, and which systems are natively integrated?
Can LPS measurement results be fed into third-party platforms such as Cornis or SkySpecs Horizon, and what does the integration path look like?
Regulatory Compliance and Expert Countersignature Requirements
Regulatory Compliance and Expert Countersignature Requirements
Does using TOPseven require additional regulatory approvals, or is the inspection covered under existing operating permits?
Must an independent expert countersign the TOPseven report for it to be usable within a structural stability assessment or accredited inspection workflow?
Does the TOPseven method comply with Qualifoudre certification requirements in France, and what usage path applies for non-certified operators?